Torquay back to Hayling Island

I have subsequently added this anecdote about my return to Devon for the final leg back to Hayling Island. I had been catching up with friends in my local pub and conscious that I needed to book my train back to Hejira in Torquay. Doing this ‘post pub’ turned out not to be a good idea. I was surprised at the cost and duration of the journey but it was only when I had bought and paid for the ticket that the reality dawned on me. I had bought a ticket to Newquay, not Torquay, what a plonker and a testament, if it was necessary, to the debilitating effects of alcohol!

The original blog continues:-

Having left Hejira in Torquay Marina for a month while Paula and I took holidays, I took the train back down to Devon on the Bank Holiday Monday to sail her back. I had long since harboured an interest in ā€˜single handingā€™ and had taken Karisma, my 31ft Parker (which I kept in Port Solent for 5 years before the Jeanneau in the Med), out on my own before, but only in the Solent and only overnight.

The forecast was for fine weather with light and variable winds, mainly from the North so most of the available anchorages would be viable. My departure before dawn the next morning was very straightforward but, although I carried the full main, there was insufficient wind to make the necessary speed to achieve the tidal ā€˜gateā€™ at Portland Bill under sail alone so it was necessary to motor until safely past the Bill.

Dawn crossing Lyme Bay
Dawn crossing Lyme Bay – with the motor sailing cone!
m_Steadying
Anchored in Worbarrow Bay with the inadequate steadying sail, soon to be improved ! I took a little swim for the picture…

Worbarrow Bay, just past Lulworth Cove was busy but there was plenty of space and all except two other yachts left before the evening. I was expecting little wind and intended to motor gently along to Studland Bay from late morning with the first of the tide. I was surprised to awake to a steady F4 from the North which was too good to waste so, despite the adverse tide (there was a useful back eddie inshore) I got under-way and had a cracking sail which sped us along (by us, I mean me and Hejira) at over 7 knots at times and the progress induced a change of plan. With a favourable tide and wind, we made straight for the Needles and the great sail continued into the Solent where the wind strength dropped and Ā it moved around to the NE. In that I was in no particular hurry and with no crew to appease, it was wonderful to have a languid beat up the Solent, weighing up the options to anchor for the night. Motoring the last hour or so, I decided to slip into Chichester Harbour and tuck behind East Head. The anchorage was busy but by lifting the keel and slipping behind the other anchored yachts I was able to find plenty of room and with the neap tide, managed to stay afloat overnight. After a leisurely breakfast and with very little wind, we motored (by we I again mean me and Hejira which had almost taken on ‘personal friend’ qualities by this stage) at little more than ā€˜tick overā€™ and almost reluctantly edged up the Emsworth Channel back to our berth in Northney Marina.

My ā€˜single handedā€™ experience had been tremendously satisfying. It was so enjoyable, I will rise above the taunts of ā€˜Billy no matesā€™ and certainly do it again. As with sailing in general, the weather plays an enormous part in oneā€™s enjoyment so I will also have to come to terms with entering a strange Marina and coming alongside but, you never know, this could pay back with even bigger doses of satisfaction!

As you will know from previous crew ā€˜missivesā€™, I have experienced a series of weird co-incidences this summer. There was another to come on my holiday in Italy while Hejira was left moored in Torquay. Before buying the S135, Paula and I had a tour of the Northshore factory (they thought they would sell me a new 42RST – not a patch on the 135!) and we saw a new 135 under construction as a special commission after the model had been superseded by the later generation of Southerlies. It had been ordered by a discerning Australian whose wife had tragically died while the new yacht, Number 30, was under construction. Later, I happened to sail into Queen Anne’s Battery Marina in Plymouth on a friendā€™s Vancouver and she was moored 3 berths away. The owner kindly showed me over her and this was the first time I had viewed a series III. So, you can imagine how surprised I was when going ashoreĀ  on the Italian Amalfi coast off Positano in the rib from a friendā€™s motor yacht, to see the same yacht, ā€˜Vikingā€™ anchored just off the port. With more tropical sailing a future probability, I was keen to understand the heat issues in the saloon with the large windows. Having had the Jeanneau in the Med for 14 years I am very well aware of oppressive heat, especially in marinas. His confirmation that it is a problem prompted me to arrange to meet Ivan from Arun Sails back in Northney and he measured up to make reflective screens for the outside of the saloon windows. Ivan is also making a replacement yankee jib, a new Ā¾ battened main sail and is supplying new jib sheets and a new spinnaker halyard so I could rig the original as a spare.

Being concerned about the untreated keel and grounding plate and thinking longer term, I am keen to have them blasted back to bare metal, epoxied and treated with copper coat. This does, it seems, present a problem for the yard (and all other yards it seems) in that ordinarily with a fixed keel yacht, the weight is largely taken on the keel so the props/cradle are mostly to keep it upright. In that for the keel treatment, the keel needs to be fully down, the weight needs to be taken by the props/cradle as the keel is free to swing. This presents a problem for the yard, particularly as the 135 draws 3 metres. The only way the yard will support her that high with the keel down is if the mast is removed to reduce the windage so, on Monday, all the mast electrics are being disconnected, the mast is being craned off and Hejira is being taken to the ā€˜blasting areaā€™ and propped up high for the 10 days required for the treatment. It is necessary to be done sooner rather than later as the temperature must be higher than 10 degrees and the weather is on the turn.

This will also present the opportunity to re copper coat the rest of the hull and do some of the other jobs I have identified before re-launching for some winter sailing.

I am considering the options for next year, mindful that Paula will want to go back to Canouan to see our daughter, Becky and that some accessible school holiday destinations are necessary for Paulaā€™sĀ  (she is a school teacher) involvement. This is, of course, subject to change but I am currently thinking that another year of UK based sailing is required to fully shake out any issues before heading off for warmer climes. Easter in a London marina may help to head off Paulaā€™s ambition to have a London pad and then take in the East coast rivers, my old haunts in North Norfolk then a leisurely cruise up to Inverness for the summer half term where Paula can fly up to join the cruise along the Caledonian Canal. I did this in my Parker 31 (without Paula) and it is spectacular. The half term week should allow a quick stop in Tobermory then marina in Oban so Paula can return on the overnight sleeper. I should then be able to take in some of the Irish Lochs which eluded me this year. Just a germ of an idea at present but that is how it is shaping up for next year.

Leave a Reply

Your email address will not be published. Required fields are marked *

Proudly powered by WordPress | Theme: Baskerville 2 by Anders Noren.